Field Remedy: 1853
| Subject: | Engine Z17DTH, high pressure pump - Reset of learned values after replacement of high pressure pump |
| Models: | Engines: | Option: |
| Corsa-C 2003...2005,Corsa-C Combo 2005,Meriva 2004...2005 | Z17DTH,Z17DTH,Z17DTH | |
| Complaint: | After replacement of high pressure pump some trouble codes (e.g. P1190) are set. |
| Cause: | Missing service information in TIS 2000 documentation to reset learned values after high pressure pump replacement. |
| Production: | |
Once the high-pressure pump has been replaced it is important to tell this to the ECU in order to reset the learn values. Otherwise some DTC´s might be set. Please refer to TECH 2, change to menu: "Programming" , choose "High-pressure pump (fuel injection pump) replaced".
The service documentation will be modified accordingly.
| FunctionalGroup: | J - Engine |
| Complaint Group: | 06 - Failure Code Setting by Control Unit |
| Trouble Code: | P1190 |