Содержание Электросхемы Раздел: Системы впрыска топлива Все разделы

Engine Z17DTH, high pressure pump - Reset of learned values after replacement of high pressure pump Opel Combo C

Field Remedy: 1853

Subject:Engine Z17DTH, high pressure pump - Reset of learned values after replacement of high pressure pump
Models:Engines:Option:
Corsa-C 2003...2005,Corsa-C Combo 2005,Meriva 2004...2005Z17DTH,Z17DTH,Z17DTH
Complaint:After replacement of high pressure pump some trouble codes (e.g. P1190) are set.
Cause:Missing service information in TIS 2000 documentation to reset learned values after high pressure pump replacement.
Production:

Remedy:

Once the high-pressure pump has been replaced it is important to tell this to the ECU in order to reset the learn values. Otherwise some DTC´s might be set. Please refer to TECH 2, change to menu: "Programming" , choose "High-pressure pump (fuel injection pump) replaced".

The service documentation will be modified accordingly.

FunctionalGroup:J - Engine
Complaint Group:06 - Failure Code Setting by Control Unit
Trouble Code:P1190